1 Overview of CRTS ][ Slab Ballastless Track Structure
1.1 Structure of CRTS II Track on Bridge
1.2 Structure of CRTS II Slab Ballastless Track on Subgrade
1.3 Structure of CRTS II Slab Ballastless Track in Tunnel
1.4 Flow of Construction Technology for CRTS II Slab Ballastless Track
2 Prefabrication Production of CRTS II Track Slab
2.1 Basic Structural Requirement for Track Slab Yard
2.2 Tooling Equipment Configuration
2.3 Organization Management for Track Slab Construction
2.4 Material Management of Track Slab Yard
2.5 Process Flow of CRTS II Track Slab
2.6 Key Points of Critical Processes
2.7 Concrete Slab Construction Operation
2.8 Quality Control
3 Subgrade Surface Treatment and Acceptance
3.1 Beam Surface Treatment and Acceptance
3.2 Acceptance of Subgrade Surface and Tunnel Foundation Construction
3.3 Quality Control
4 Waterproof Layer Construction
4.1 System Structure of Waterproof Layer
4.2 Construction Procedure and Technological Process
4.3 Process Conditions for Spraying Construction
4.4 Construction Method
4.5 Inspection Acceptance
4.6 Construction Preparation of Waterproof Layer
4.7 Organization of Construction Workers
4.8 Quality Control
5 Construction of Sliding Layer and Extruded Sheet
5.1 Construction Technology Process
5.2 Extruded Sheet Laying
5.3 Construction of "Two Fabrics One Film" Sliding Layer
5.4 Personnel Allocation for Working Face
5.5 Configuration of Machine and Equipment
5.6 Quality Control
6 Construction of Bed Plate on Bridge
6.1 Unit Division, Surveying and Setting out for Bed Plate Construction
6.2 Shear Alveolar Treatment and Shear Nail Installation
6.3 Steel Bar Tying
6.4 Fabrication and Installation of Steel Plate Connector
6.5 Construction of Bed Plate Formwork
6.6 Concrete Pouring and Curing
6.7 Construction of Longitudinal Tensioning Connection for Bed Plate
6.8 Quality Control
7 Construction of Supporting Layer for Subgrade and Tunnel
7.1 Construction Process Flow of Supporting Layer or Subgrade and Tunnel
7.2 Construction of Supporting Layer Surface
7.3 Personnel Allocation
7.4 Machine and Equipment Allocation
7.5 Construction of Fixed Terminal Spine and Friction Board on Subgrade
7.6 Quality Control
8 Track Slab Laying and Fine Adjustment
8.1 Process Flow for Track Slab Laying and Fine Adjustment
8.2 Track Slab Transport and Temporary Storage
8.3 Track Slab Rough Laying
8.4 Track Slab Rough Adjustment
8.5 Track Slab Fine Adjustment
8.6 Quality Control
9 Cement Emulsified Asphalt Mortar Pouring
9.1 Pouring Process of Cement Emulsified Asphalt Mortar
9.2 Construction Preparation before Pouring
9.3 Preparation and Transport of Cement Emulsified Asphalt Mortar
9.4 Quality Control
10 Construction of Lateral Baffle
10.1 Construction Preparation
10.2 Construction Technology of Lateral Baffle
10.3 Quality Control