您好,欢迎光临有路网!
客货共线铁路电力工程施工技术规程(Q\CR9657-2015 英文版)
QQ咨询:
有路璐璐:

客货共线铁路电力工程施工技术规程(Q\CR9657-2015 英文版)

  • 作者:中国铁路总公司
  • 出版社:中国铁道出版社
  • ISBN:9787113228507
  • 出版日期:2017年01月01日
  • 页数:178
  • 定价:¥1200.00
  • 分享领佣金
    手机购买
    城市
    店铺名称
    店主联系方式
    店铺售价
    库存
    店铺得分/总交易量
    发布时间
    操作

    新书比价

    网站名称
    书名
    售价
    优惠
    操作

    图书详情

    内容提要
    This Specification is formulated to guide the construction management of electric power engineering for passenger-freight railway (hereinafter referred to as "the railway electric power
    engineering") ,unify the construction technical standards and ensure the construction quality.
    This Specification is applicable to construction of railway electric power engineering.
    The railway electric power engineering must be constructed strictly in accordance with approved design documents. Dynamic manage
    目录
    1 General Provisions

    2 Terms

    3 Construction Preparation
    3.1 Construction lnvestigation
    3.2 Verification of Construction Drawings
    3.3 Executive Construction Organization Design
    3.4 Preparation of Construction Machinery
    3.5 Construction Sites and Temporary Works
    3.6 Operation Personnel
    3.7 Commencement Report

    4 Substation and Distribution Substation
    4.1 General Requirements
    4.2 Foundation and Frame
    4.3 Barrier and Fence
    4.4.Outdoor High Voltage and Fully-Enclosed SF6 Gas Insulated Switchgear (GIS)
    4.5 011 Immersed Transformer,Reactor and Instrument Transformer
    4.6 High Voltage Circuit Breaker
    4.7 Other High Voltage Electrical Equipment
    4.8 Indoor and Fully-enclosed SF6 Gas Insulated High Voltage Switchgear
    4.9 Switchgear
    4.10 Pre-fabricated Substation
    4.11 Control, Protection, lntegrated Automation and Secondary Circuit Connection
    4.12 Bus Bar Device
    4.13 Installation of AC & DC Devices
    4.14 Start-up, Trial Operation, Energization and Putting into Operation

    5 Electric Power Supply SCADA System
    5.1 General Requirements
    5.2 Equipment Installation in Control Station
    5.3 Installation of Controlled Station Equipment
    5.4 Commissioning of Control Stations and Controlled Stations
    5.5 Integrated Commissioning for SCADA System

    6 Overhead Power Lines of 35 kV and Below
    6.1 General Requirements
    6.2 Construction Survey
    6.3 Foundation Pouring
    6.4 Pole and Tower Erection and Insulator Installation
    6.5 Stay Wire Installation
    6.6 Conductor Erection
    6.7 Erection of Insulation Conductors
    6.8 Installation of Line Equipment
    6.9 Service Wire

    7 Cable Lines
    7.1 General Provisions
    7.2 Laying of Direct-buriaI Cables
    7.3 Cable Laying inside Cable Trenches and Cable Tunnels
    7.4 Cable Laying along Railway Tunnels and Bridges
    7.5 Cable Laying Passing through Rivers and Streams
    7.6 Cable Laying in Substations and Distribution Substations
    7.7 Fabrication of Terminals and Intermediate Joints of Power Cables

    8 Low Voltage Power Distribution
    8.1 General Requirements
    8.2 Installation of Low Voltage Power Cabinets and Low Voltage Power Distribution Boxes
    8.3 Low Voltage Circuit Breakers and Leakage Protection Devices
    8.4 Low Voltage Disconnectors, Blade Switches and Change-over Switches
    8.5 Low Voltage Contactors and Starters
    8.6 Controllers, Push Buttons and Travel Switches
    8.7 Resistors, Rheostats and Electromagnets
    8.8 Power Distribution Lines and Fuses
    8.9 Power Distribution Devices for Motors and Cranes
    8.10 Flameproof Electric Equipment

    9 Electric Lighting
    9.1 General Requirements
    9.2 Indoor Lighting
    9.3 Outdoor, Station and Yard Lighting
    9.4 Lighting Wiring
    9.5 Switches and Sockets
    9.6 Lighting at Locations for Protection against Hazards of Explosion and Fire

    10 Electromechanical Equipment Monitoring
    10.1General Provisions
    10.2 Installation of Monitoring Equipment
    10.3 System Network Wiring
    10.4 Integrated Commissioning of Monitoring Equipment and Controlled Objects

    11 Lightning Protection, Earthing and Safety
    11.1 General Provisions
    11.2 Lightning Protection
    11.3 Laying of Earthing Network
    11.4 Connection of Earthing Electrode
    11.5 Earthing of Electric Equipment
    11.6 Earthing for Equipment at Locations with Hazards of Explosion and Fire

    Appendix A Diagram for Insulation Treatment at Load Carrying Joint
    Appendix B Diagram for Conductor Crimping and Dimensions of Notches

    Words Used for Different Degrees of Strictness

    与描述相符

    100

    北京 天津 河北 山西 内蒙古 辽宁 吉林 黑龙江 上海 江苏 浙江 安徽 福建 江西 山东 河南 湖北 湖南 广东 广西 海南 重庆 四川 贵州 云南 西藏 陕西 甘肃 青海 宁夏 新疆 台湾 香港 澳门 海外