您好,欢迎光临有路网!
中国铁路总公司企业标准(Q/CR 9607-2015):高速铁路信号工程施工技术规程(英文版)
QQ咨询:
有路璐璐:

中国铁路总公司企业标准(Q/CR 9607-2015):高速铁路信号工程施工技术规程(英文版)

  • 作者:中国铁路总公司
  • 出版社:中国铁道出版社
  • ISBN:9787113213282
  • 出版日期:2016年04月01日
  • 页数:111
  • 定价:¥800.00
  • 猜你也喜欢

    分享领佣金
    手机购买
    城市
    店铺名称
    店主联系方式
    店铺售价
    库存
    店铺得分/总交易量
    发布时间
    操作

    新书比价

    网站名称
    书名
    售价
    优惠
    操作

    图书详情

    内容提要
    This specification was formulated for the purpose of unifying the technical requirements on the construction of high-speed railway signaling system projects, strengthening the technical management of the construction, and guaranteeing the engineering quality.
    This specification is applicable to the construction of high-speed railway signaling system projects and shall be taken as reference in the construction of inter-city railway signaling system proj ects.
    The construction of high-speed rail
    目录
    1 General Provisions
    2 Terms
    3 Basic Requirements
    3.1 GeneralRequirements
    3.2 Client
    3.3 Designlnstitute
    3.4 Contractor
    3.5 Supervision Firm
    3.6 Operation and Maintenance Company
    4 ConstructionPreparation
    4.1 Constructionlnvestigation
    4.2 Shop Drawings Check
    4.3 Selection of Construction Scheme and Allocation of Resources
    4.4 Construction Operation Guide
    4.5 Construction Technical Instructions
    4.6 FirstArticlelnspection
    5 Optical and Electric Cable Line
    5.1 General Requirements
    5.2 CableRouteResurvey
    5.3 Single Drum Testing,Cable Drum Allocation and Transportation of Cables
    5.4 Cable Laying
    5.5 Cable Protection
    5.6 Cable Splicing
    5.7 CableTermination
    5.8 Installation of Cases and Boxes
    5.9 Wiring of Cases & Boxes
    6 Fixed Trackside Signal and Sign Board
    6.1 GeneralRequirements
    6.2 High Post Colorlight Signal
    6.3 DwarfColorlight Signal
    6.4 Signal Sign Board
    7 Switching Equipment and Switch Snow-Melting Equipment
    7.1 General Requirements
    7.2 Installation Device
    7.3 External Locking Device
    7.4 Switch Machine
    7.5 Switch Closure Detector
    7.6 Locking Detector
    7.7 Switch Snow Melting Device
    8 Track Circuit
    8.1 General Requirements
    8.2 Trackside Equipment
    8.3 Compensation Capacitor
    8.4 Rail Insulation
    8.5 Track Bonds
    8.6 Choke Transformer
    9 Balise and Outdoor Lineside Electronic Unit(LEU)
    9.1 General Requirements
    9.2 Balise
    9.3 Outdoor Lineside Electronic Unit(LEU)
    10 Trackside Equipment for Onboard Equipment Detection
    10.1 GeneralRequirements
    10.2 Testing Equipment Box and Testing Loop of Trackside Equipment for Onboard Equipment Detection
    10.3 BTM Antenna Testing Equipment
    11 Indoor Equipment and Equipment Container
    11.1 General Requirements
    11.2 Control & DisplayEquipment
    11.3 Power Supply Equipment
    11.4 Cabinet Equipment
    11.5 Indoor Wiring
    11.6 Equipment Container
    11.7 Cable Lead-in
    12 Lightning Protection and Earthing
    12.1 General Requirements
    12.2 Lightning Protection for Equipment
    12.3 Earthing of Indoor Equipment
    12.4 Earthing of Outdoor Signaling Equipment
    12.5 Earthing of Equipment Container
    12.6 Integrated Earthing System
    13 Commissioning
    13.1 General Requirements
    13.2 Single-item Commissioning of Equipment
    13.3 Commissioning of Subsystems
    13.4 Commissioning of System Interfaces
    14 Project Acceptance
    14.1 Acceptance for Unit Works
    14.2 Static Acceptance
    14.3 Dynamic Acceptance
    Appendix A Log Sheet for Signaling System Construction
    Explanation of Wording in this Specification

    与描述相符

    100

    北京 天津 河北 山西 内蒙古 辽宁 吉林 黑龙江 上海 江苏 浙江 安徽 福建 江西 山东 河南 湖北 湖南 广东 广西 海南 重庆 四川 贵州 云南 西藏 陕西 甘肃 青海 宁夏 新疆 台湾 香港 澳门 海外